| The final Eastern Trail
Engineering Feasibility Study: Final Report, published by Wilbur Smith Associates; Terrence J. DeWan & Associates,
is available for download from web site by clicking on the file names
below.
These are large PDF files, so may take a while to
download depending on the speed on your connection.
The text of the Final
Report is in two files:
A detailed Corridor Map
of the Proposed Eastern Trail is available
here
Files on specific trail segments:
Trail
Segment #4 - Jewett Trail Head to
Emerys Bridge Road
Trail
Segment #5 - Emerys Bridge Road to S.
Berwick/ N.Berwick Town Line
Trail
Segment #6 - S. Berwick/N.Berwick Town
Line to N. Berwick/Wells Town Line
Trail
Segment #7 - N. Berwick/Wells Town
Line to Bald Hill Road
Trail
Segment #8 - Bald Hill Road to Chicks
Crossing Road
Trail
Segment #9 - Chicks
Crossing Road to Wells/Kennebunk Town Line Trail
Segment #10 - Wells/Kennebunk Town Line to Route 99
Trail
Segment #11 - Route 99 to Kennebunk/Arundel Town Line
Trail
Segment #12 - Kennebunk/Arundel Town
Line to Old Limerick Road
Trail
Segment #13 - Old Limerick Road to Arundel/Biddeford Town Line
Trail
Segment #14 - Arundel/Biddeford Town
Line to Route 111
Trail
Segment #15 - Route 111 to Saco River
Trail
Segment #16 - Saco River to Route
I-195
Trail
Segment #17 - Route I-195 to Saco/Old
Orchard Beach Town Line
Trail
Segment #18 - Saco/Old Orchard Beach
Town Line to O.O.B./Scarborough Town Line
Trail
Segment #19 - O.O.B./Scarborough Town
Line to Black Point Road/Route 207
Trail
Segment #20 - Black Point Road/Route
207 to Scarborough/South Portland Town Line
Trail
Segment #21 - Scarborough/South
Portland Town Line to Ball Fields
|